One of the great engineering marvels of the world. The canal stretches over 100 miles from Port Said and the Mediterranean Sea to Suez and the Red Sea. Excavation of the canal began on 4月25日th, 1859, and on 1869年11月17日 the barrage of the Suez plains reservoir was breached and waters of the Mediterranean flowed into the Red Sea. Unlike the Panama Canal, the Suez Canal has no locks, because the Mediterranean Sea and the Gulf of Suez have roughly the same water level. The passage takes between 11 and 16 hours at a speed of around 8 knots. The low speed helps prevent erosion of the canal banks by ship's wakes. この目的地は未開発なエリアであるため、ツアーは企画されておりませんので、ご了承ください。

港: スエズ運河を通過
体験

スエズ運河を通過

All programs below may not be available on every sailing.

Sort By

Shore excursions are not currently available for this port. If new shore excursions are developed, they will be added to this page once complete.

どうぞお気軽にお尋ねください。
ページトップへ戻る